08-15-2024, 07:06 AM
A comm opened to the Bridge from Engineering: [Thorn to Bridge, I'm setting up the sequence for a power transfer. I'll start at the minimal transfer, to be sure it is safe. The initiation of the transfer will be at control from the Bridge, but I'll monitor from Engineering. I should have it set up by the time we're in position.]